Some Details

Our backyard 2/28/2010

Guest Bathroom (not finished)

Tin Ceiling

The Double Chimney

Varnished maple stair treads drying

Future voracious eaters of most things beautiful.

2006

Three of five bathroom windows.

Deb in the living room.

2009

2006 86, 3/4 ton Chevy pushed to the limit. Future stairs.
This entry was posted on Sunday, January 31st, 2010 at 10:30 pm and is filed under Some Details.
You can follow any comments to this entry through the RSS 2.0 feed.
You can leave a comment, or trackback from your own site.